NETANN-L Archives

- NETANN-L - Networkmaine Network Announcement List

NETANN-L@LISTS.MAINE.EDU

Options: Use Forum View

Use Monospaced Font
Show Text Part by Default
Show All Mail Headers

Message: [<< First] [< Prev] [Next >] [Last >>]
Topic: [<< First] [< Prev] [Next >] [Last >>]
Author: [<< First] [< Prev] [Next >] [Last >>]

Print Reply
Subject:
From:
Reply To:
- NETANN-L - Networkmaine Network Announcement List <[log in to unmask]>
Date:
Sun, 16 Jul 2017 10:59:39 -0400
Content-Type:
text/plain
Parts/Attachments:
text/plain (28 lines)
Work is complete for today.  4th floor/IDFC is completely migrated to 
new switches.  3rd floor still has a few connections to move from 
cat-p-wishcamper-idfb2 to the new switch.  The old switches in IDFC have 
been powered down as well as IDFB1 and IDFB3.  I will get together with 
somebody tomorrow to remove them from NMIS as I do not yet have access 
to change devices in the tool.  We will schedule another time to do the 
2nd floor/idfa and finish the 3rd floor/idfb.

Chris Thibault
Network Engineer
Networkmaine, University of Maine Systems US:IT
(207) 212-5164

On 07/12/2017 08:55 AM, Chris Thibault wrote:
> Where: USM Portland - Wishcamper building
> Start: 07/16/2017 06:00 am
> End: 07/16/2017 10:00 am
> Scope: brief outage during the window
>
> Summary:
> 	New switches will be installed in 2nd and 4th floor networking closets. All existing connections will be migrated to the new switches.
>
> Networkmaine Contact Info:
> 	NOC 581-3587
>
> Local/Campus Contact Info during this window of work:
> 	NONE / Unknown at this time

ATOM RSS1 RSS2