Work is complete for today. 4th floor/IDFC is completely migrated to new switches. 3rd floor still has a few connections to move from cat-p-wishcamper-idfb2 to the new switch. The old switches in IDFC have been powered down as well as IDFB1 and IDFB3. I will get together with somebody tomorrow to remove them from NMIS as I do not yet have access to change devices in the tool. We will schedule another time to do the 2nd floor/idfa and finish the 3rd floor/idfb. Chris Thibault Network Engineer Networkmaine, University of Maine Systems US:IT (207) 212-5164 On 07/12/2017 08:55 AM, Chris Thibault wrote: > Where: USM Portland - Wishcamper building > Start: 07/16/2017 06:00 am > End: 07/16/2017 10:00 am > Scope: brief outage during the window > > Summary: > New switches will be installed in 2nd and 4th floor networking closets. All existing connections will be migrated to the new switches. > > Networkmaine Contact Info: > NOC 581-3587 > > Local/Campus Contact Info during this window of work: > NONE / Unknown at this time