Where: Lawrence, MA
Start: 05/11/2024 01:00 am
End: 05/11/2024 06:00 am
Scope: External Connectivity

Summary: 
	Crown Castle will be performing fiber maintenance between our Lawrence, MA and Manchester, NH optical nodes. This work will impact our external connectivity capacity, but due to the time traffic levels should be low enough that other peering links are able to take the load.

The following other services will be impacted with this work:

Jackson Labs Connecticut Link

Networkmaine Contact Info: 
	NOC 581-3587

Local/Campus Contact Info during this window of work: 
	NONE / Unknown at this time