Done. Building did not go down, just PCs connected to switch #2. On Sun, Oct 18, 2020 at 7:57 AM Jason McDonald <[log in to unmask]> wrote: > running a little over the estimated time, should be done by 9AM > > On Fri, Oct 16, 2020 at 11:36 AM Jason McDonald <[log in to unmask]> wrote: > >> Where: UMA Bangor >> Start: 10/18/2020 07:00 am >> End: 10/18/2020 08:00 am >> Scope: College Center >> >> Summary: >> Swapping cat-b-center-bdf switch #2, since it is failing a >> physical port loopback diagnostic. >> >> >> Networkmaine Contact Info: >> NOC 581-3587 >> >> Local/Campus Contact Info during this window of work: >> NONE / Unknown at this time >> > > > -- > Jason McDonald > Network Engineer I > Networkmaine, University of Maine System > -- Jason McDonald Network Engineer I Networkmaine, University of Maine System