Where: USM Gorham Costello Sports Complex Start: 07/09/2020 06:00 am End: 07/09/2020 08:00 am Scope: Loss of Network Connectivity Summary: Switches will be powered down and disconnected temporarily while our contractor re-arranges the data racks to accommodate the new cabling being installed. Networkmaine Contact Info: NOC 581-3587 Local/Campus Contact Info during this window of work: [log in to unmask]