Where: UM Start: 01/15/2020 05:00 am End: 01/15/2020 08:00 am Scope: UM Campus, Target Tech, Diagnostic Research Lab Summary: To resolve an issue where newly connected interfaces fail to establish a link, we have been advised by the vendor to apply a software patch to the Neville distribution switch. This will result in about 10 minutes of downtime during the window for the following connected LAN switches on the Orono Campus, with the exception of UMPD-BDF1 which will only experience a few seconds of lost packets as the link fails over. cat-o-1944-cca-bdf cat-o-amc-bdf cat-o-androscoggin-bdf1 cat-o-ascc-bdf cat-o-cumberland-bdf1 cat-o-datacenter (management) cat-o-dpc-bdf cat-o-dtav-cc-bdf cat-o-eannex-bdf cat-o-esrb-bdf cat-o-gannett-bdf cat-o-hauck-bdf cat-o-hilltop-bdf1 cat-o-hitchner-bdf cat-o-innovation-bdf cat-o-jenness-bdf cat-o-keyo-bdf1 cat-o-knox-bdf cat-o-murray-bdf cat-o-mtl-bdf cat-o-neville-bdf cat-o-neville-fiber cat-o-oldtown-mill-bdf cat-o-oxford-bdf cat-o-oxford-core cat-o-drl-bdf cat-o-planetarium-bdf cat-o-reccenter-bdf cat-o-service-idfc cat-o-shibles-bdf cat-o-somerset-bdf cat-o-stewart-bdf cat-o-telecom cat-o-umpd-bdf1 cat-o-union-bdf cat-o-upark-bdf cat-o-wmeb-tower cat-target-tech Networkmaine Contact Info: NOC 581-3587 Local/Campus Contact Info during this window of work: NONE / Unknown at this time