Where: UMaine Orono Campus Start: 04/08/2018 05:00 am End: 04/08/2018 08:00 am Scope: Hannibal Hall, Hilltop., Innovation, Nutting, Oak, Patch, South Annex H, and Sigma Chi network access Summary: The following buildings are having their network switches software upgraded. Hannibal Hilltop Innovation Nutting Oak Patch South Annex H Sigma Chi The upgrade will require about 15 minutes of downtime, but full time slot is reserved in case of issues. Networkmaine Contact Info: NOC 581-3587 Local/Campus Contact Info during this window of work: NONE / Unknown at this time