Where: Orono When: Jul 20, 2016 0500 Expected Duration: 1hr Scope: Nutting Hall Summary: The IDF uplink will be moved to the new BDF switch. The 24 port switches in BDF and IDF will both be migrated to new 48 port switches. Networkmaine Contact Info: NOC 561-3587 Local/Campus Contact Info during this window of work: NONE / Unknown at this time