Where: Portland When: Apr 24, 2016 7:00am Expected Duration: 1hr Scope: MSLN/UMS non-campus sites Summary: During the maintenance window a core router will be upgraded. The majority of sites involved will be MSLN sites as well as some UMS non-campus locations. Most (if not all) sites connected to this router will NOT realize a loss of connectivity as their secondary paths will remain active. Networkmaine Contact Info: NOC 561-3587 Local/Campus Contact Info during this window of work: NONE / Unknown at this time