Where: Bangor When: Apr 15, 2015 0500 Expected Duration: 1hr Scope: MDI Bio Labs, Ellsworth schools, COA, City of Ells, Ellsworth Ctr, MDI schools, Jesup Lib, Bar Harbor City Hall, Hancock Cty Coop Ext, Ellsworth Pub Lib Summary: Inserting a DCM module into the optical path. Sites listed should remain up on backup links; down time for the optical work should be no more than 15-20 minutes. Networkmaine Contact Info: NOC 561-3587 Local/Campus Contact Info during this window of work: NONE / Unknown at this time