Where: Machias When: Jun 25, 2014 5a Expected Duration: 2hrs Scope: Wireless Summary: The wireless controller at Machias will be upgraded. During the upgrade all wireless will be unavailable on the campus. Networkmaine Contact Info: NOC 561-3587 Local/Campus Contact Info during this window of work: NONE / Unknown at this time