Where: Univesity Centers, Coop Ext Offices and Orono Campus When: 5:00 am Expected Duration: 4hrs Scope: Routers and switches Summary: Routers and switches at University Centers and Coop Ext. Offices will be reloaded to upgrade IOS images. On the Orono Campus I will be upgrading a number of switches all over campus. Local connectivity will be interrupted during the reload. Each reload should last approximately 5 - 10 minutes. UNET Contact Info: NOC 561-3587 (this should transfer to the Operator who can get in touch with the appropriate person) Local/Campus Contact Info during this window of work: NONE / Unknown at this time