Jeffrey Letourneau <[log in to unmask]>
Reply To:
- NETANN-L - Networkmaine Network Announcement List <[log in to unmask]>
Date:
Sun, 5 Feb 2023 05:55:26 -0500
Content-Type:
text/plain
Parts/Attachments:
text/plain (55 lines)
Mechanical services were able to get 1 of the 2 CRACs functioning. Room
temperatures are returning to normal with storage systems and VM
infrastructure coming back up.

All systems should be back to normal.

We have been limping along on 1 of 2 CRAC since Friday evening. Upon
inspection that evening, it was determined both units have one compressor
that was down due to low suction.  Mechanical services recharged one of the
units with refrigerant  and made some adjustments to help keep its pressure
up in the sub zero temperatures. They left the second one offline until it
can be repaired.

This morning at approx 1:30am outside temperatures rose high enough (above
0 F) that the single, adjusted CRAC unit did not keep the room cool.
Mechanical services was called back in and made additional adjustments to
the unit so that it is now able to keep up with the hat load of the room.

Work on both CRAC units will resume on Monday.

Jeff
--
Jeff Letourneau
Executive Director, Networkmaine
UMS:IT
University of Maine System
t: 207-581-3507
<https://www.linkedin.com/company/networkmaine>
<https://twitter.com/Networkmaine> <https://www.facebook.com/networkmaine>



On Sun, Feb 5, 2023 at 4:22 AM Jeffrey Letourneau <[log in to unmask]> wrote:

> The Portland Data Center has had both AC units fail. The storage systems
> and VM infrastructure have been shut down. Networking and telephone service
> remain online for now.
>
> Staff is on site with mechanical services while they are working on
> getting cooling back on line.
>
> Updates will be provided as more information becomes available.
> Jeff
>
> --
> Jeff Letourneau
> Executive Director, Networkmaine
> UMS:IT
> University of Maine System
> t: 207-581-3507
> <https://www.linkedin.com/company/networkmaine>
> <https://twitter.com/Networkmaine> <https://www.facebook.com/networkmaine>
>
>