Maintenance will be performed Sunday morning to move the remaining switches
homed off of the 10 and 100 boards on the Hart switch to Gigabit
connections. The buildings affected by the move are:
Alfond Arena
Crossland Hall
Corbett Hall
Dunn Hall
Fernald Hall
Hannibal Hamlin Hall
All efforts will be made to get the buildings up and active as quickly as
possible, however, there may be some extended periods of downtime for the
above buildings during the maintenance window (5AM - 10AM) as we work to
move the buildings over.
Walter Hilenski [log in to unmask]
Phone: (207)561-3526
============================================
== Communications Specialist
== UNET Technology Services, Network Operations
== Maine School and Library Network
== University of Maine System
============================================