Where: Orono and Bangor Campus
When: 5:00 am
Expected Duration: 5hrs
Scope: Switches on each campus
Summary:
On the Orono Campus and Bangor Campus I will be upgrading a number of switches all over campus.
Local connectivity will be interrupted during the reload. Each reload should last approximately 5 - 10 minutes.
UNET Contact Info:
NOC 561-3587 (this should transfer to the Operator
who can get in touch with the appropriate person)
Local/Campus Contact Info during this window of work:
NONE / Unknown at this time