This maintenance is completed.
Joseph Arsenault
Network Engineer II
Networkmaine, University of Maine System US:IT
207-581-3561
On Fri, Apr 26, 2024 at 12:47 PM <[log in to unmask]> wrote:
> Where: Umaine Farmington Campu
> Start: 04/28/2024 05:00 am
> End: 04/28/2024 07:00 am
> Scope: Entire Campus
>
> Summary:
> The battery backup supporting the optical link to the Farmington
> campus and surrounding MSLN sites will be replaced.
>
>
> We do not expect any downtime from this replacement.
>
> Networkmaine Contact Info:
> NOC 581-3587
>
> Local/Campus Contact Info during this window of work:
> NONE / Unknown at this time
>