Where: USM Portland - Wishcamper
When: May 03, 2017 5 am
Expected Duration: 2hrs
Scope: Internet connectivity - Wishcamper
Summary:
The switches in Wishcamper will be replaced with upgraded switches.
This will cause roughly 30 minutes of downtime for the following buildings:
Wishcamper
Woodbury Campus Center
25 Bedford
Heat Plant
Networkmaine Contact Info:
NOC 581-3587
Local/Campus Contact Info during this window of work:
NONE / Unknown at this time