Where: Lewiston/Auburn Ctr
When: 6:00
Expected Duration: 1/2hr
Scope: migrate UPS cords to new Generator fed outlets
Summary:
Will be moving the power cords from street power to generator power. The UPS should hold all equipment up during the move. So, no outages expected. Sites involved include:
- LAC
- Andro-Sag Coop Ext.
- Oxford Coop Ext.
- MPBC (Lewiston)
UNET Contact Info:
NOC 561-3587 (this should transfer to the Operator
who can get in touch with the appropriate person)
Local/Campus Contact Info during this window of work:
NONE / Unknown at this time