NETANN-L Archives

- NETANN-L - Networkmaine Network Announcement List

NETANN-L@LISTS.MAINE.EDU

Options: Use Forum View

Use Monospaced Font
Show Text Part by Default
Condense Mail Headers

Message: [<< First] [< Prev] [Next >] [Last >>]
Topic: [<< First] [< Prev] [Next >] [Last >>]
Author: [<< First] [< Prev] [Next >] [Last >>]

Print Reply
Mime-Version:
1.0 (Mac OS X Mail 11.2 \(3445.5.20\))
Sender:
- NETANN-L - Networkmaine Network Announcement List <[log in to unmask]>
Date:
Wed, 11 Apr 2018 06:21:24 -0400
Reply-To:
- NETANN-L - Networkmaine Network Announcement List <[log in to unmask]>
Message-ID:
Subject:
From:
Chris Thibault <[log in to unmask]>
Content-Type:
text/plain; charset=us-ascii
In-Reply-To:
Content-Transfer-Encoding:
quoted-printable
Comments:
Parts/Attachments:
text/plain (32 lines)
Work is complete, however, the Gorham Heat building switch did not come back up after the reboot.  Network connectivity is still down in the heat building.  I am heading to the Gorham campus to troubleshoot.

Chris Thibault
Network Engineer
Network Maine, University of Maine System US:IT
(207) 780-4392

> On Apr 9, 2018, at 9:12 AM, Chris Thibault <[log in to unmask]> wrote:
> 
> Where: USM
> Start: 04/11/2018 05:00 am
> End: 04/11/2018 07:00 am
> Scope: Loss of network connectivity
> 
> Summary: 
> 	Upgrading network switches resulting in loss of service for about 30 minutes in the following buildings:
> Portland Sullivan Gym
> Portland 45 Exeter St
> Portland 47 Exeter St
> Portland 49 Exeter St
> Portland 55 Exeter St
> Gorham Heat building
> Gorham Academy Building
> 
> While the downtime should be less than 30 minutes, in the event of issues during the upgrades more time may be required to resolve any problems that may arise.
> 
> Networkmaine Contact Info: 
> 	NOC 581-3587
> 
> Local/Campus Contact Info during this window of work: 
> 	2077804392

ATOM RSS1 RSS2