This was restored by around 7:15AM , there were 4 connections on switch #6
including the temp construction trailer which were restored at ~8:05AM.
On Wed, Aug 30, 2023 at 4:05 PM <[log in to unmask]> wrote:
> Where: Fogler 120M "Telecom IDFB Room"
> Start: 08/31/2023 12:00 am
> End: 08/31/2023 02:00 am
> Scope: High
>
> Summary:
> EMERGENCY MAINTENANCE
> The network switches in Fogler's IDFB has experienced a fault during
> operational hours. Known interruptions of service occurred this afternoon.
> Resolution includes software upgrade and hardware replacement after
> operational hours.
>
> Details:
> EMERGENCY MAINTENANCE
> cat-o-fogler-idfb/6 started throwing stack-related faults, so ~2pm stack
> cables, and then the switch itself, were replaced, but the issue persisted.
> Course of action toward resolution includes reloading the stack and a
> software upgrade to IOSXE 16.12.09 for the stack, outside of operational
> hours ASAP.
>
> Networkmaine Contact Info during the window for this work:
> [log in to unmask] 2075813587
> NOC 581-3587
>
> Local/Campus Contact Info during this window of work:
> 2073855279
>
--
Jason McDonald
Network Engineer II
Networkmaine, University of Maine System
|
|
|