This maintenance is partially complete.
During the firmware upgrade an IO module on the chassis experienced a
hardware failure resulting in loss of connection to VMs on the blades.
This downtime was approximately 10 minutes.
Cisco has been contacted and a new part has been dispatched to prevent
future interruptions.
Adam
*Adam Paradis*
Virtualization Administrator | Data Center Operations | Networkmaine | US:IT
University of Maine System
Direct Phone: 207-581-3529
Direct Email: [log in to unmask]
Group Phone: 207-581-3550
Group Email: [log in to unmask]
Data Center Operations - Confluence
<https://gojira.its.maine.edu/confluence/pages/viewpage.action?pageId=26149063>
On Wed, Feb 14, 2018 at 2:28 PM, Adam Paradis <[log in to unmask]>
wrote:
> Where: Orono
> Start: 02/18/2018 06:00 am
> End: 02/18/2018 09:00 am
> Scope: Cisco UCS Infrastructure/VMware
>
> Summary:
> Updating firmware for UCS infrastructure including fabric
> interconnects and multiple chassis to incorporate new blade servers. The
> existing blade servers in this infrastructure (which are VMware hosts) will
> not be updated in conjunction with this maintenance and instead will be
> updated at a later time using a staggered approach. No downtime is
> expected.
>
> Networkmaine Contact Info:
> NOC 581-3587
>
> Local/Campus Contact Info during this window of work:
> NONE / Unknown at this time
>