Work is complete for today. 4th floor/IDFC is completely migrated to new
switches. 3rd floor still has a few connections to move from
cat-p-wishcamper-idfb2 to the new switch. The old switches in IDFC have
been powered down as well as IDFB1 and IDFB3. I will get together with
somebody tomorrow to remove them from NMIS as I do not yet have access to
change devices in the tool.
Chris Thibault
Network Engineer
Networkmaine, University of Maine Systems US:IT
(207) 212-5164
On 07/12/2017 08:55 AM, Chris Thibault wrote:
Where: USM Portland - Wishcamper building
Start: 07/16/2017 06:00 am
End: 07/16/2017 10:00 am
Scope: brief outage during the window
Summary:
New switches will be installed in 2nd and 4th floor networking
closets. All existing connections will be migrated to the new
switches.
Networkmaine Contact Info:
NOC 581-3587
Local/Campus Contact Info during this window of work:
NONE / Unknown at this time