All maintenance is complete, everything should be back up and running.
Thank you,
Corey Lavoie
Director, Structured Cabling & Campus Networks
Networkmaine, University of Maine System US:IT
On Mon, Apr 15, 2019 at 1:31 PM Corey D Lavoie <[log in to unmask]> wrote:
> Where: UM - Campus, Hitchner
> Start: 04/17/2019 03:00 am
> End: 04/17/2019 07:00 am
> Scope: Network Connectivity for Hitchenr Hall
>
> Summary:
> During the maintenance window we will be working on the fiber from
> the BDF to IDFB (Second Floor) and IDFC (Third Floor). While this work is
> performed, networking and IP phone connections will be unavailable for the
> second and third floor.
>
> All work should be completed by 7:00 am.
>
> Networkmaine Contact Info:
> NOC 581-3587
>
> Local/Campus Contact Info during this window of work:
> NONE / Unknown at this time
>