This maintenance is complete.
Disruption to core voice services and UMPD dispatch was limited to < 30
seconds throughout all upgrades:
05:20:58 to 05:21:07 service failure (reboot of active)
05:29:12 to 05:29:29 service restoration
Individual buildings (not dual-homed) experienced ~ 10 min. of downtime as
their corresponding distribution switches were reloaded.
On Wed, Jan 16, 2019 at 10:35 AM Ray Soucy <[log in to unmask]> wrote:
> Where: UM campus
> Start: 01/20/2019 05:00 am
> End: 01/20/2019 07:00 am
> Scope: Core Network
>
> Summary:
>
> Reboot of UM campus core and distribution switches to apply configuration
> changes.
>
> Building uplinks will see roughly 15 min. of downtime.
>
> This maintenance will be also be used to test and verify redundancy and
> failure conditions for core VoIP services as well as connectivity to UM
> public safety.
>
> Networkmaine Contact Info:
> NOC 581-3587
>
> Local/Campus Contact Info during this window of work:
> NONE / Unknown at this time
>
--
Ray Patrick Soucy
Senior Cyber Security Engineer
Networkmaine, University of Maine System US:IT
207-581-3526