Subject: | |
From: | |
Reply To: | |
Date: | Wed, 15 Aug 2018 06:47:25 -0400 |
Content-Type: | text/plain |
Parts/Attachments: |
|
|
Complication during maintenance caused an outage for all the sites listed
above. All connections have been reverted back to the old optical switch.
All sites should be back up and running.
The maintenance will be delayed to another date as we troubleshoot the
issue further.
On Mon, Aug 13, 2018 at 11:50 AM, Lucas Wood <[log in to unmask]> wrote:
> Where: Orono
> Start: 08/15/2018 04:30 am
> End: 08/15/2018 07:00 am
> Scope: MaineREN Sites
>
> Summary:
> During the maintenance window we will be migrating links to a new
> core optical switch. All sites should flip to their southern path during
> the window, but may experience degraded service during the maintenance
> window.
>
> The following sites may experience degraded service during the window:
>
> UMS:
> UMFK
> UMPI
> East Millinocket Center
> Houlton Center
> Southern Aroostook Coop Ext
>
> MSLN:
> Fort Kent Library
> Fort Kent HS
> Abel Morneault Memorial Library
> Van Buren Dist Secondary School
> Stearns HS
> Mattanawcook HS
> Northern Penobscot Tech Region 3
> Medway MS
> East Millinocket Library
> Houlton HS
> SATC
> Cary Library
>
>
> Networkmaine Contact Info:
> NOC 581-3587
>
> Local/Campus Contact Info during this window of work:
> NONE / Unknown at this time
>
--
*Lucas Wood*
Network Engineer I
Networkmaine, University of Maine System US:IT
207-581-3532
|
|
|