Where: Belfast
When: May 22, 2016 6a
Expected Duration: 2hrs
Scope: Optical Network
Summary:
Will be upgrading the optical switches in Belfast one at a time (three total). Each switch should take about ~10-15 minutes to upgrade.
Only sites directly homed off of the Belfast switches will experience a loss of connectivity.
Networkmaine Contact Info:
NOC 561-3587
Local/Campus Contact Info during this window of work:
NONE / Unknown at this time