Ran into issues and had to back out of the maintenance. All services
should have returned to normal.
On Fri, Aug 7, 2015 at 1:44 PM, John Scofield <[log in to unmask]> wrote:
> Where: Belfast Hutchinson Center
> When: Aug 12, 2015 0530
> Expected Duration: 1hr
> Scope: Belfast and Rockland Centers, Belfast area schools and libraries
>
> Summary:
> Installing one larger capacity switch to replace two smaller
> switches.
>
> Networkmaine Contact Info:
> NOC 561-3587
>
> Local/Campus Contact Info during this window of work:
> NONE / Unknown at this time
>